Mana Badi Nadu Nedu - Foundation Schools and Anganwadi buildings Construction in Nadu-Nedu Phase-II -Guidelines

Mana Badi Nadu Nedu - Foundation Schools Construction in Nadu-
Nedu Phase-II -Guidelines basic infrastructure works 
with Nadu Nedu components for improving Infrastructure facilities 
in  Anganwadi   Buildings   and   construction   of  new  Anganwadi 
Buildings Implementation  of the  program  through  Foundation 
School Development committees through Community Contracting -
Guidelines


File No.11/175/2022-CIVIL SEC-SSA

GOVERNMENT OF ANDHRA PRADESH SCHOOL EDUCATION DEPARTMENT

CircularNo.1794016/MBNN/2022 Dt.26.07.2022
Sub:-  Mana Badi Nadu Nedu - Foundation Schools Construction in Nadu-
Nedu Phase-II -Guidelines to take up   basic infrastructure works 
with Nadu Nedu components for improving Infrastructure facilities 
in  Anganwadi   Buildings   and   construction   of  new  Anganwadi 
Buildings -  Implementation  of the  program  through  Foundation 
School Development committees through Community Contracting -
Guidelines for implementation of the program - Orders Issued -
Regarding .
********
Government  has  taken  a  decision  to  give  a  facelift  to  all  the
Government   Schools including Foundation Schools   and Satellite
Foundation Schools (Anganwadi Centres) in the State by improving the infrastructure   to   provide   quality   education   including   pre-primary education.
(2) Government decided to:
I. Construct  new AWCs  for the  building-less AWCs  outside  primary 
Schools.
II. Construct new AWCs for the centres located in the school premises. Ill. Up gradation of AWCs located in School premises under Nadu-Nedu 
Phase-II.
(3)  Government  vide  G.O.  No.84,  dated 24.12.2021  has  introduced certain  changes  in  the  Education  system  where  in  PP1,  and  PP2  are introduced as part of the primary education. As they are now part of the Education system Infrastructure improvements are proposed under Phase
-II of Mana Badi Nadu-Nedu Program.
(4) Director Women and Child Welfare department has given the list of the AWCs to be taken up in consultation with District collectors for both upgradation and for new construction.
5. For  the  implementation  of  the  program  the  following  orders  and guidelines are   issued.
(5) Unit cost for construction of Foundation Schools:
a) Satellite Foundation School Building
753 square feet plinth area with a unit cost of Rs 14 lakhs and Rs.2.50 lakhs for providing Furniture and Play equipment for 2236 AWCs where the
 
File Noll /175/2022-CIVIL SEC-SSA


centres are   running in rented buildings and are 1KM away from Primary / UP School campus.  The budget will be tied up with NABARD/RIDF and State funds.
b) Class rooms for Pre-Primary (AWC) in Co - located Foundation Schools
Each class room will have 646 Sft Plinth  areas (including varandah) with a unit cost of 13 lakhs. The size of Class Room will be 6100 X 7300 mm (20 X 24) and Veranda will be 1830)(7300 mm (6)(24).
(6) Implementing agencies:
The Project for new construction and upgradation of Foundation Schools shall be executed by the respective Engineering Departments on par with Phase-II Nadu-Nedu Schools. The construction works which are already  in  progress  and  are  under execution  through  Panchayat  Raj Department  and  Tribal  Welfare  Department  and  Housing  shall  be completed   by  the   Panchayat   Raj   Department   and  Tribal   Welfare Department  and  Housing  Department  only.   For  other  projects  the Executing agencies of Phase-II will take up these works as part of Phase
2 of MBNN Program.
(7) Role  of  Foundation   School   Development  Committee  and Parents Committee:
a. All the Satellite Foundation Schools(located outside School campus) 
will  be taken  up by  Foundation  School  Development committees 
through community contracting methodology on the lines of Mana 
Badi Nadu-Nedu program.
b. Additional  class rooms for PP1  and  PP2  will  be taken  up by the 
Parents Committees of the respective schools.
c. The satellite Foundation School (Anganwadi) Development
Committee shall be formed with the following members
1. Sachivalayam Engineering Assistant
2. Anganwadi Teacher
3. Supervisor, Women and Child Welfare Department (Convenor)
4. Mahila Samrakshana karyadarsi (Mahila police)
5. Five  mothers  of  the  children  age 3  to 5  years  who  are attending AWC(s).
d. For collocated AWC The Parents Committee will have the following members
1. School Head Master (Convenor)
2. 1 CDS Supervisor (Member).
 
File No.11/175/2022-CIVIL SEC-SSA




3. Anganwadi Teacher
4. Sachivalayam Engineer Assistant (Member).
5. Five Parents of School going Children (SMembers) of AWC there  is one  School development Committee exists the same shall  be confirmed with  including of AW Teacher on co-opted member.
(8) Process:
a. A  meeting  shall  be  conducted  with  the  above  members  and  a
resolution has to be passed for opening of Bank a/c in the Bank to receive and to operate funds received from Government for making payments.
b. The Committee shall open a Joint Bank account in a Government /
Public sector bank close to the habitation or convenient to them duly submitting the resolution copy of their meeting. All the members of the committee as explained above shall be signatories of the Bank account. The name of the bank account should not be on the name any individual. The name of the account should be in the format
`Foundation   School   development   committee (The   unique
number of the AWC) ... village.
c. Out of the Nine members any Eight members can sign the cheque in
case of absence of one member. Signature of Anganwadi teacher, Supervisor, WD&CW is mandatory on every Cheque.  The same may be informed to the Bank while opening the bank account.
d. Before commencement of the work by FSDC or PC the Department
will  release 15 %  of  the  sanctioned  amount  on  receipt  of  the resolution of FSDC and PC as per technical sanctioned estimate as revolving fund into the account of the FSDC or PC Committee of the concerned AWC using the STMS software to meet the labour charges and material (local) procurement. Upon expenditure and uploading the bills the revolving fund will be replenished after 1/3rd of the revolving fund is spent till the total amount to be handled by the FSDC OF PC is reached.
e. The Bank account details should be entered in the STMS software by
the respective Supervisor, WD&CW for co-located Foundation School and by HM in case of co-located AWC. The first page of the bank account pass book shall be uploaded in STMS. The details like Bank account number,  IFSC code shall be uploaded  by the Supervisor, WD&CW/HM as the case may be.
 
File No.11/175/2022-CIVIL SEC-SSA




f. The   Foundation   School (Anganwadi)   development   Committee/
Parents  committee  shall  execute  the  works  by  engaging  local masons and labourers and by procuring local material required for the work. They shall pay the rates as per existing rates in the local market   Limited   to   the   rates   communicated   vide   Memo   no 1679742/MBNN dated 28/03/2022 and  subsequent circulars issued by Commissioner, School Education.
g. The rates fixed by the FSDC or PC shall be invariably recorded in the
minutes   book   of   Committee.   The   Mandal   Engineer   of   the implementing  agency shall  guide  the  FSDC or  PC  in  this  matter accordingly.
h. The  Foundation  School  Development  Committee  and  P.0  shall
conduct regular (fixed) weekly meetings at the time and day as per the convenience of all the   Nine members. All the members shall attend the weekly meetings and take all necessary decisions in the
meeting.   The   meetings   shall   be   conducted   in   the   PS/AWC premises/site only. The decisions should  be taken  in a  collective democratic manner. The FSDC/PC shall take final decision regarding
everything around the execution of new building construction.
i. The procurement and payment of expenditure shall be done as per
the decisions taken  in  the  FSDC/PC Committee. The  FSDC or PC Committee will pass the resolution for payment of each and every transaction.
j. The FSDC or PC Committee shall maintain book keeping system to
account for every rupee spent. The Local material rates fixed by the FSDC or PC shall be invariably recorded in the minutes book of FSDC or PC Committee. The Books of account include Minutes Book, Cash
Book, Stock Register, Vouchers, and Receipts (for material).
k. All  the  committee  members  shall  go  to  the  market  and  study
thoroughly  about  the  quality  and  specifications/standards  of the material  available  in  the  market  and  procure  them.  The  field Engineer shall ensure that the required quantity of materials to be procured   is   as  per  the  progress  and   as  per  the  theoretical requirement.  After  completion  of  the  orientation  cum   training program, the FSDC or PC Committee shall commence the work with the support of the Sachivalayam Engineering Assistant, and Mandal Engineer.
I. The  FSDC  or  PC committee shall  enter into two  page  Mall with
 
File No.11/175/2022-CIVIL SEC-SSA


Mandal Engineer, for the purpose of execution of the construction work.
m.The FSDC or PC Committee will take up the activities in a systematic 
manner duly conducting meetings with committee members once in 
a week and explain the activities completed during the week and 
activities  of  next  week  and  complete  the  project  as  per  the 
specifications and standards with complete transparency. The FSDC 
or PC Committees shall be given orientation cum training program 
before commencement of the work.
n. One day orientation program should be organized for a group of 30 
FSDC Members at Mandal level.
(9) Role   of   Sachivalyam   Engineering   assistant /Amenities Secretary:
a. The Engineering assistant shall conduct general body meeting of all 
mothers and explain about the sanction of the program to their AWC 
and seek their support for completion of the program.
b. The Mandal Engineer and Sachivalayam Engineering Assistant shall 
explain  the  FSDC  or  PC  Committee  about  the  provisions  and 
activities of the sanctioned estimate of the AWC.
(10) Nadu-Nedu  Photos :
i. Nadu (before work is started) photos of buildings of existing AWC5
whether own buildings or rented buildings or rent free buildings shall be captured in through the mobile App of STMS. The mobile App should be operated by the Supervisor and capture status of existing status of existing AWC5 through photos.
ii. Once the construction work is completed, Nedu photos should be 
captured again through the mobile App by the Supervisor.
iii.The Engineers   shall   ensure   that   the   life   span   of   any   new
construction/material lasts for 75   years  while   preparing   the
estimates.   The   provisions   in   the   estimates   shall   be   made accordingly.
iv.The Grama/Ward  Sachivalayam  Engineering Assistant will prepare 
the detailed work estimates of the selected AWC using the templates 
given for new construction of AWC in the STMS software.  Mandal 
Engineer of the executing agency shall coordinate with all concerned 
in the activity.
v. The Engineer shall fill the leads and lifts for each material so that the 
engineering  datas  are  worked  out  by  the  software  through  a
 
File No.11/175/2022-CIVIL SEC-SSA




program.
vi.For every technical estimate there should be a People's estimate 
which shall be prepared  by the Engineers based on local  market 
rates of labour and materials.
vii.While preparing the estimates the Sachivalayam Engineer, Mandal 
Engineer,  shall  consult  the  Anganwadi  Development  committee 
members and seek their advice in finalizing the provisions to be kept 
in the estimates. A resolution to this extent may be taken from the 
Committee by the Sachivalayam  Engineer and the same may be 
uploaded  by  the  Sachivalayam  engineer  while  generating   the 
estimates.
viii.For new building construction, only one input data sheet shall be 
filled up. The information like type of soil at foundation level, need 
for pile foundation shall be captured. The need for pile foundation 
shall be finalised by the DEE of Executing agency.
ix.Based  on  the  type  of  the  foundation  chosen,  estimate  will  be 
generated  by the  STMS  automatically.  A model  estimate  will  be 
made  available  in  the software  as the quantities  are tentatively 
same for a fixed dimensions.
(11) Provisions in the Estimates:
a. 2.5 Lakhs Nadu-Nedu the following provisions shall be made in the 
estimates.
i. Shishu Desk (one per two children's).
ii. Drinking Water System (if drinking water system of co-located school 
in another block of the School.
iii. Refrigerator one door.
iv. Play equipment with sand pit
- Slider
- See-Saw
- Swing
v)   Storage Rack (RCC)
No civil work shall be taken up under these works There shall be only one set of outdoor play  material and Drinking Water System, if there are more than  one AWC in one premises.

b) 5 Lakhs Nadu-Nedu above five provisions plus the following
i. Repairs
ii. Painting with Wall Arts.
 
File No.11/175/2022-CIVIL SEC-SSA




(12) Administrative and technical sanctions:
a. In case Satellite Foundation Schools, The Project Director, Women
Development   and   Child   Welfare   shall   download   the   draft proceedings along with work estimates from the STMS software and put   up   admin   Sanction   to   District   Collector   for   obtaining administrative sanction.
b. While  processing  sanctions the  PD  shall  ensure that  all  relevant
components  are  covered  for  all  the  Anganwadi  Centres.  If  one component  is  not  needed,  the  same  may  be  certified  by  the concerned Mandal Engineer in the Input data sheet.
c. District Collector shall accord administrative sanction based on the
technically approved estimate approved by the concerned Engineer. One for normal foundation and another for pile foundation.
d. After  the   administrative  sanction   is   accorded   by  the   District
collector, the Executive Engineer shall accord technical sanction.
e. After execution of the work through Foundation School Development
Committees, the Engineers shall facilitate working estimate at the end  of  the  work  wherever  required.   The  technical  sanctioned estimates shall be used for the purpose of assessing value of work
done (to be recorded in M-Book) at the end of the work.
f. There shall be one estimate, one administrative sanction and one
technical sanction for each Foundation School for Nadu-Nedu new construction works. Sub estimates shall be done for each component for Nadu-Nedu components.
(13) Building Plan and Orientation:
A layout and type design of 813 Sft plinth area (includes 60 Sft toilet)
has  been  developed  for  construction  of Anganwadi  Centres (Satellite Foundation  School). All the new constructions should follow this layout without any deviations. The layouts of the Anganwadi Centre for site area of 5 Cents and site area of 3 Cents are attached herewith in Annexure 1 and Annexure 2 respectively.
a  Outside the School Campus (Satellite Foundation School):
Typical  Anganwadi  Center  design  with 753   Sft  plinth   area (including  toilets)  building  consisting  of Class  Room, Antenatal Room,  Kitchen  Room,  Storage  Room  and  verandah  is  to  be provided. One Toilet Room with 36 Sft plinth area is also to be provided separately. The plan of AWC and Toilet is enclosed for reference.
 
File No.11/175/2022-CIVIL SEC-SSA




b. Inside the School Campus (Co located Foundation School):
In the co-located Foundation School we may construct new Room for AW purpose on the first floor or second floor. There we should spare ground floor room for W purpose and first floor/ second floor should be used for bigger classes.
c. If PP1 and PP2 Children are less than 25 only One Normal class room
should be constructed.
d. If PP1 and PP2 Children are more than 25 nos and less than 40, the
proposed Foundation School should have Two Rooms. One will be a typical Anganwadi Building with 753  Sft plinth  area consisting  of class  room,  Antenatal  Room,   Kitchen   Room,   Store  Room   and veranda is to be provided separately. One Toilet Room with 36 Sft plinth area is also to be provided separately if exists toilets are not accessible to PP1, PP2 children in terms of distance. The plan of AWC and Toilet is enclosed for reference.
The second Class Room will be typical School Class Room  and shall be constructed attached to the main School building.
e. If the PP1 and PP2 children are more than 40 and less than 60 the proposed  Foundation  School  will  be  with 3  Rooms   One  typical Anganwadi Building and   the other two Class Rooms shall be typical School Class Rooms attached to the  main School building. The plan of AWC and Toilet is enclosed for  reference.
(14) Fund flow:
The following are the guidelines on fund flow, fund releases and fund management.
a. As the works are being executed through FSDC or PC without 
contractors hence  they need  initial  investment to start the 
work and execute the work. Hence the Revolving Fund shall be 
paid to the FSDC or PC account © 15 % of total project cost, i.e 
on the technical sanctioned amount of the project.
b. The FSDC or PC shall pass resolution and upload the resolution 
copy and bank details in STMS seeking the revolving fund.
c. This 15 % Revolving fund will be replenished based on actual
expenditure on the project. As and when the expenditure is met, the bills/vouchers will be uploaded by the Supervisor in STMS. All vouchers  and  bills shall  be signed  by Anganwadi Teacher, Supervisor   WD&CW,   Sachivalayam   Engineering Assistant before they are uploaded by the Supervisor WD&CW.
 
File No.11/175/2022-CIVIL SEC-SSA


The uploaded bills/invoices shall  be received by the Mandal Engineer in his/her log in. The Mandal Engineer shall upload the same after satisfying about the appropriateness. The same will be received by APC, Samagra Shiksha. The APC, Samagra Shiksha will check whether the bills are in appropriate shape like signatures on all bills, contents on bills etc and verify in STMS. Upon reaching the 1/3rd of the revolving APC, Samagra Shiksha will raise the FTO and submit to CFMS and the CFMS portal will facilitate the amounts to FSDC or PC committee's accounts as part of replenishment.  The expenditure will  be replenished to FSDC or PC account in such a way that the total releases shall  not  be  more  than the technically sanctioned amount minus the estimated  amount for centrally procured materials.
d. FSDC or PC are permitted to meet petty expenses like going
around the market, for watch and ward and rent charges for room required for storage etc from their revolving fund. They are not permitted to draw any sitting expenses for their weekly meetings.
e. While uploading bills/vouchers from either from Masteries or
from vendors or from suppliers, the details of the vendors and details  of the  invoice/bill  shall  be  entered  in  STMS  by the supervisor.
f. The FSDC or PC Committee with the help of the Engineering
Assistant,   Mandal   Engineer  shall   identify  the   appropriate supplier/vendor, negotiate, finalize and procure the materials across the counter by giving cheque for the amount of the bill/voucher.
g. For every transaction there should be proper bills/invoice. And
every bill shall have printed voucher having Serial number. The voucher books shall be supplied by the APC, Samagra Shiksha to all AWCs under the program.
h. The  FSDC  or  PC  Committee  shall  make  all  the  payments
through cheques only, however in some cases cash payments may be paid for the expenses not more than Rs.5000/-.
i. The Supervisor ICDS/ HM (as the case may be) in the capacity
of convenor of is authorized  to hold  an  imprest  amount of Rs.5000/-(Rupees five thousand only) at any given point of
 
File No.11/175/2022-CIVIL SEC-SSA


time to meet petty expenses. The total amount through this imprest shall  not exceed  Rs.15000/- for the  upgradation  of works and Rs.30000/- for new construction.
j. The Supervisor on behalf of the FSDC or PC shall upload every
voucher/bill indicating the details of payments made to various Vendors/Masteries and other expenses through a Mobile App in STMS. The details of payment voucher/bills include capturing photo of the voucher/bill,  name of the vendor,  place of the vendor, date of the vendor, Total amount of the voucher/bill, quantities, rate, Cheque number etc.
k. Every voucher/bill  shall  be  recorded  as  'paid'  and  shall  be
signed by Engineering assistant, Anganwadi Teacher,
Supervisor and one of the mother's (signatory of the cheque) and then only captured in Mobile App in STMS.
I. Every voucher/bill shall be recorded as 'Entered in App` by the
convenor once it is captured and entered in the Mobile App. No bill/voucher shall be uploaded second time in STMS. No bills / vouchers shall be uploaded before the material is received at site.  Also  the  bill/voucher  shall  not  be  uploaded  without actually paid. This amounts to misappropriation and attracts disciplinary action.
m.The  Supervisor, !CDS  being the Convener shall ensure that
every rupee is approved by the FSDC or PC and every rupee is accounted for in both books of accounts (Minutes, Cash Book, General  Ledger,  Stock  Register,  and  Voucher)  and  also  in STMS. All vouchers and bills and invoices shall be uploaded in STMS. The original bills vouchers and invoices shall be kept in the  premises  of AWC  by  the  Anganwadi  Teacher  until  the completion of the program plus two years after completion of the program.
n. The Supervisor shall write books of accounts. They shall attend 
the weekly meetings of the FSDC or PC invariably.
(15) Convergence and role of various departments:
a. The Director, WD&CW department shall coordinate the entire 
dept  in  the  implementation  of  the  Anganwadi  Nadu  Nedu 
program. She shall monitor the execution, quality and progress 
of the works with their field staff regularly.
b. The PD W&C dept and the Executive Engineers of Executive
 
File No.11/175/2022-CIVIL SEC-SSA


agencies shall  together take  the  responsibility  in  arranging orientation cum training programs to all CDP0s, Supervisors, Sachivalayam Engineers, Mahila Samrakshana Karyadarshis of
Gram/Ward Sachivalayams, Anganwadi Development
Committees  and  other stakeholders.  Both  the  officers shall work in  close coordination  and  ensure that the  program  is implemented effectively.
c. The PO ITDA shall coordinate with Engineering assistants and 
Women development & Child welfare dept staff and provide 
the  leadership  in  their  ITDAs  in  the  implementation  of the 
program.
(16) Time Schedule for the program:
The  program  shall  be  started  from 30th July 2022  and  shall complete  by end of April 2023.  The  Director W&C dept with  the advice of the Advisor (Infra) shall chalk out detailed time schedule for various activities to be taken up under the program.
All the District Collectors, Joint Collectors, Project Officers, ITDA, Project   Directors  W&C  dept,   Executive   Engineers  of  Executive Agencies, DE0s, School Education department and APCs, Samagra 5hiksha  shall  take  full  responsibility of the  program  and  provide leadership in the districts.
(17)  Central Procurement Materials:
The  Managing  Director,  APEWIDC  shall  make  arrangements  to procure material requested for AWC / Satellite Foundation Schools duly taking permission for High level Tender Committee of Nadu-Nedu.
S Suresh Kumar
Commissioner,School Education
To
The Director, Women & Chile Welfare , Jampani Towers, Guntur. All the District Collectors in the State.
All District Education Officers& Ex-Officio Project Coordinators of Samagra Shiksha  in the state
All Additional Project Coordinators of Samagra Shiksha  in the state
Copy  submitted  to  Special  Chief   Secretary  to  Government,  School Education, AP, Velagapudi.
Copy to
The State Project Director, Samagra Shiksha, Vijayawada, NTR District. The Managing Director, APEWIDC, Vaddeswaram, Guntur District
 
File No.11/175/2022-CIVIL SEC-SSA


Copy to the Engineer-in Chief, PRED, TWED, PH, RWS/The Chief Engineer, APEWIDC/ State Project Engineer , Samagra Shiksha.
 
File No.11/175/2022-CIVIL SEC-SSA





























































 